demingrating.com

Deming Rating Green Existing Mass Rapid Transit System Rating

Site and Station The executives (SSM)

SSM Compulsory
Prerequisite 1 Green Strategy

SSM Required
Necessity 2 Isolation of Waste

SSM Credit 1 Multi-purpose Suburbanite Transport

SSM Credit 2 Advance utilization of Elective Fuel Vehicles

SSM Credit 3 Widespread Access

SSM Credit 4.1 Intensity Island Moderation, Non-rooftop

SSM Credit 4.2 Intensity Island Moderation, Rooftop

SSM Credit 5 Green Schooling

SSM Credit 6 Station Tasks and Support

Water Proficiency (WE)

WE Compulsory
Prerequisite 1 Proficient Water Installations

WE Compulsory
Prerequisite 2 Downpour Water Collecting, Station

WE Credit 1 Ultra Proficient Water Installations

WE Credit 2 Downpour Water Collecting, Station and Viaduct

WE Credit 3 Water Metering

Indoor Climate and Worker Solace (IEC)

IEC Compulsory
Prerequisite Natural Air Ventilation

IEC Credit 1 Indoor Air Quality (IAQ) Observing and Control

IEC Credit 2 Segregation of Dirtying Hardware and Frameworks

IEC Credit 3 Daylighting

IEC Credit 4 Eco-accommodating Housekeeping Synthetics

IEC Credit 5 Worker Offices

IEC Credit 6 Reliability

IEC Credit 7 Unwavering quality

Energy Proficiency (EE)

EE Compulsory
Prerequisite Eco-accommodating Refrigerants and sans halon Frameworks

EE Credit 1.1 Energy Proficiency, Foothold

EE Credit 1.2 Energy Proficiency, Non-foothold

EE Credit 2 On location Environmentally friendly power

EE Credit 3 Off-site Environmentally friendly power

EE Credit 4 Energy Metering and The executives

EE Credit 5 Green House Gas Relief

Advancement Classification (IC)

IC Credit 1.1-1.6 Advancement Credits

IC Credit 2 IGBC Licensed Proficient

Translate »